SOLAR ENERGY PROJECTS

2018/10/02 09:18:53

SOME TYPICAL PROJECTS HAVE BEEN IMPLEMENTED

 

   -     Design and install grid connected solar power system with a capacity of 50 kWp

 

 

    • Location: Hoang Ha office building, 158 Nguyen Xi - Ward 26 - Binh Thanh District - Ho Chi Minh Cit
    • Time: September 2016.

  -   Solar grid connected system with a capacity of 60 kWp

 

  • Location: Vietnam Bishops Conference Building, 72/12 Tran Quoc Toan - Ward 8 - District 3 - Ho Chi Minh City
  • Time: December 2016

  -   

                 Solar grid connected system with capacity of 30 kWp

 

 

 

  • Location: 554/19 Cong Hoa Street - Ward 13 - Tan Binh District - HoChiMinh City.
  • Time: December 2017.

 -    Solar power system supports online monitoring system at Thu Duc Water Plant

 

  • Location: Thu Duc Water Factory.
  • Time: May 2018.


 

Projects are and will be implemented

 

   -    Solar grid connected system with a capacity of 350 kWp

 

  • Location: Binh Tan District, HCM City.
  • Time: August 2018.

  -     Project of designing, processing and installing frame for solar farm Srepok 1 - stage 1: 50 MW

 

 

  • Location: Daklak Province.
  • Time: June 2018.

 






Contact with us

+84(28) 5445 2103/04/05
+84(28) 5445 2102
info@hoangha-engineering.com.vn

Online Support

Business
Technique