Menu

NUI CUI STATUE

Period
2019-2020
Items
Nui Cui Statue
Location
Dong Nai Province
ABOUT PROJECT

A statue of the Virgin Mary has been placed at the center of the pilgrimage site of Our Lady of Nui Cui in Gia Tan 1 commune, Thong Nhat district, which belongs to the Xuan Loc diocese, located about 90 km away from the center of Ho Chi Minh City. The project is located near National Highway 20, heading towards Da Lat.

 

The construction of this project commenced on August 15th, 2018, and it is currently being completed. This place is one of the largest pilgrimage centers in Vietnam, with the square alone having a capacity of 100,000 people.

Other project
DABACO BAC NINH OIL FACTORY
Location: Bac Ninh Province
SUNSTEEL FACTORY WITH CAPACITY OF 700M3 PER DAY
Location: Binh Duong Province
PRODUCTION LINE FOR HUSK MEMBER MANUFACTURING
Capacity: 5,000 tons per month
WASTE WATER TREATMENT WITH A CAPACITY OF 5,000 CUBIC METERS
Location: Duc Hoa District, Long An Province
SHEEN BRIDGE FACTORY
Location: Long An Province
WARE HOUSE TAN THUAN CO.,LTD
Location: Ho Chi Minh City
PLANNED RESIDENTIAL AREA (ID JUNCTION)
Location: Dong Nai Province
PORTABLE WATER TANK SYSTEM
Location: Buon Ma Thuot City, Dak Lak Province.